Custom Lake House Wrap-around Porch Stairs Re-built

Old, rotten porch stairs were demoed. Gravel was brought in to cover dirt and provide better erosion control and water drainage. New concrete footer was poured for stair stringers to sit on. New wrap-around stairs were framed on 12' centers. TimberTech composite risers/decking installed. Fortress Fe26 black welded Aluminum Railing installed.

CITY

Lavonia, GA

DATE

Jan 2026

CATEGORY

Custom Stairway

JOB LENGTH

9 Days

before of L-shaped stairs in front of lake house with 5 treads, white kick plates, white wood trim railings, and rotted read on the lowest step
stair demo begins with treads and kick plates removed from stairs to reveal much rotted wood
stair demo continues with removal of old treads displaying the old wood stringers
stair demo is completed with old stairs completely gone and frames laid for new concrete foundation
white rock gravel is laid over the old dirt under and around the stairs to match the current gravel landscaping in front of the house
cement foundation for the new stairs has cured
stair rebuild starts with new stringers and precision-cut mitered corners at the corner of the L-shape stairs
stair rebuild continues with new wood kick plates installed on the new stringers
close up of the precision-cut mitered corners of the corner of the L-shaped stairs
after image of the completed and newly stained stairs with sleek black metal railings at the corner of the L-shape and on the open side